Future Power Allocation

 

The 32.25 MW power has been allocated from Ratnagiri Gas Power Plant, Dabhol for which PPA is  signed.

Power Purchase Agreement signed with BARH STPP of NTPC for 40 MW and Mauda STPP for 25 MW. However actual allocation will be made by Ministry of Power. These projects will be coming up in the 12th Plan Period.

-    Power Purchase Agreement signed have been signed with the following upcoming Power Plant of NTPC / NPCIL, as below :-

-    BARH STPP of NTPC for 40 MW and Mauda STPP for 25 MW. However actual allocation will be made by Ministry of Power. These projects will be coming up in the 12th Plan Period.

-    Mauda – Stage – I (2x500 MW), Stage – II (1320 MW) [PPA]

-    VSTPS – Stage – IV (2x500 MW), Stage – V (500 MW) [PPA]

-    LARA – (2x800 + 3x800 MW) [PPA]

-    KORBA – (500 MW) [PPA]

-    NPCIL – Kakrapar 2015 for 100 MW (Requisition)

-    KHARGONE STPP (2X660 MW) for 100 MW (Requisition)

-    GADARWARA STPP, Stage – I & II (2x660 + 2x660 MW) for 100 MW (Requisition)

-    DHUVARAN STPP, Stage – I & II (2x660 + 1x660 MW) for 100 MW (Requisition)

-    NTPC-SAIL for 50 MW (Requisition)