Official website of the Daman and Diu Electricity Department, U.T. Administration of Daman and Diu, Government of India

Tariff Order

Download Tariff Order
1. Tariff Schedule
Sr.No Category Fixed Charges Energy Charges
1. DOMESTIC
(i) 0-100 units INR/Consumer/Month Single Phase: INR 20 Three Phase: INR 45 1.20 INR/kWh
(ii) 101-200 units 1.70 INR/kWh
(iii) 201-400 units 2.10 INR/kWh
(iv) 401 and above 2.45 INR/kWh
(v) Low Income Group (Up to 2x40 W bulbs only) Power supply to low income group connections will be charged at INR10 per service connection per month. For any unauthorized increase in the load beyond 2*40 watts, penal charges at the rate of INR20 per month per point will be levied and the installation will be liable for disconnection.  
 
2. COMMERCIAL
(i) 0-100 units INR/Consumer/Month Single Phase: INR 25 Three Phase: INR 50 2.50 INR/kWh
(ii) 101 units and above 3.40 INR/kWh
 
3. HT COMMERCIAL
(i) HT Commercial 100 INR/kVA/month 3.60 INR/kVAh
 
4. AGRICULTURE
(i) For sanctioned load up to 10 HP (15 kW) - 0.65 INR/kWh
(ii) Beyond 10 HP (15 kW) and up to 99 HP (75 kW) sanctioned load - 0.90 INR/kWh
 
5. PUBLIC LIGHTING
(i) For all units - 4.00 INR/kWh
 
6. LT Public Water Works
(i) LT Public Water Works 25.00/- INR per HP or part thereof 3.60 INR/kWh
 
7. LT INDUSTRIAL
(i) LTP Motive Power 25.00/- INR per HP or part thereof 3.10 INR/kVAh
1) Fixed Charges shall be reduced by 25% in the lean season from May to August for Fishery Industry
 
8. HT/EHT Industry
(i) High Tension Consumer (For all units) 240 INR/kVA/month 3.60 INR/kVAh
(ii) HT Industrial (Ferro Metallurgical/ Steel Melting/ Steel Rerolling/Power Intensive (For all units) 425 INR/kVA/month 3.55 INR/kVAh
  • Fixed Charges shall be reduced by 25% in the lean season from May to August for Fishery Industry
 
9. HOARDINGS/SIGNBOAR DS    
(i) Hoarding/Signboards 100 INR/ kVA / Month or part thereof 6.20 INR/kWh
 
10. EV CHARGING STATION 100 INR/kVA/month 4.00 INR/kWh
 
11. Temporary Supply    
  Tariff for Temporary Connection shall be Fixed/ Demand charges (if any) plus energy charges (for relevant slab, if any) under corresponding permanent supply category plus 50% of both. For multi activity pursuit, applicable Tariff for temporary connection shall be with reference to that of non-domestic category for permanent supply.
2. Schedule of Miscellaneous Charges
Description Approved Charges
Monthly Meter Rental Charges
Single Phase LT meter INR 10 per month or part thereof
Three Phase LT meter INR 25 per month or part thereof
LT Meter with MD indicator INR 200 per month or part thereof
Tri-vector Meter INR 500 per month or part thereof
Note:
The type of meters to be installed in consumer premises will be decided by the department. Generally the consumers having connected load above 50 HP will be provided with L.T.M.D meters
Reconnection Charges
LT Services  
Single Phase LT INR 100/-
Three Phase LT INR 500/-
HT Services INR 1500/-
Note: If the same consumer seeks reconnection within 12 months from the date of reconnection or disconnection, 50% will be added to above charges
Testing Fee for Various Metering Equipment
Single Phase INR 200/-
Three Phase INR 500/-
Three Phase Tri-vector Meter (0.5 Class) Industrial LT Consumer INR 1,000/-
Three Phase Tri-vector Meter (0.5 Class) 11 kV HT Consumer INR 1,000/-
Three Phase Tri-vector Meter (0.2 Class) 66 KV EHT Consumers INR 1,500/-
ABT meter 0.2 class-66 kV/11kV Consumer INR 3,000/-
Combined CT/PT Unit for 11 KV Consumer INR 1,000/-
66 KV CT/ PT Unit INR 1,000/
Three Phase CT Block INR 500/-
CT Coil INR 500/-
Service Connection Charges
Single Phase LT INR 250/-
Three Phase LT INR 1,000/-
HT (First 500 KVA) INR 10,000/-
HT (Beyond 500 KVA) INR 1,000/- per 100 KVA or part thereof
Extra Length - Single Phase INR 50 /- per meter
Extra Length - Three Phase INR 100/- per meter
Extra length chargeable will be beyond the permissible 30 meters free length from existing network for new connections for all categories except agriculture. Free length in respect of new agriculture consumer is 300 meters.
Entire Cost of setting up HT connection would be borne by the consumer and the agreement period would be two years for the category. 15% supervision charges shall be recovered by the ED DD.
Fees (Non-refundable) for submission of Test Report of wiring Completion
Single Phase Lighting / Domestic INR 20/- Per Test Report
Three Phase Lighting / Domestic INR 50/- Per Test Report
Single Phase Lighting / Non Domestic INR 100/- Per Test Report
Three Phase Lighting / Non Domestic INR 200/- Per Test Report
Three Phase LT Industries INR 500/- Per Test Report
Single Phase / Three phase Agriculture / Streetlight / Public Lighting & others INR 100/- Per Test Report
HT Industries upto 500 KVA INR 2,000/- Per Test Report
HT Industries upto 2500 KVA INR 8,000/- Per Test Report
HT Industries above 2500 KVA INR 15,000/- Per Test Report
Download Tariff Order