Official website of the Daman and Diu Electricity Department, U.T. Administration of Daman and Diu, Government of India

Tariff Order

Download Tariff Order
Sr. No. Category Fixed Charge Energy Charge
1. DOMESTIC
i 0-100 units Rs/Consumer/Month
Single Phase: Rs 20
Three Phase: Rs 45
1.10 Rs/kWh
ii 101-200 units 1.60 Rs/kWh
iii 201-400 units 1.95 Rs/kWh
iv 401 and above 2.30 Rs/kWh
v Low Income Group (Up to 2x40 W bulbs only) Power supply to low income group connections will be charged at Rs10 per service connection per month. For any unauthorized increase in the load beyond 2*40 watts, penal charges at the rate of Rs20 per month per point will be levied and the installation will be liable for disconnection.
2. COMMERCIAL
i 1-100 units Rs/Consumer/Month
Single Phase: Rs 25
Three Phase: Rs 50
2.40 Rs/kWh
ii 101 units and above 3.25 Rs/kWh
3. LT INDUSRTIAL
i LTP Motive Power Rs 25.00/- per HP or part thereof 3.00 Rs/kWh
Power Factor Charges

Any motive power connection above 3 HP running without proper capacitors installed so as to maintain Power Factor 0.90 as per the Commission's Regulation 11/2010 shall be charged extra 2.5 % of units consumed as additional power factor charges. Payment of the power factor charge won't exempt the consumer from his responsibility to maintain the power factor. In case of abnormal power factor decrease, the department will give the consumer 15 days' time to install appropriate capacitors and maintain the standard power factor. If the consumer is not able to rectify the problem within the notice time, the connection will be liable for disconnection. The ED DD reserves the right to install a suitable capacitor at its own cost and recover the cost thereof as arrears of energy charges. In case the monthly average power factor is less than 0.70 lagging, the installation is liable for disconnection after due notice.

4. LT Public Water Works
LT Public Water Works Rs 25.00/- per HP or part thereof 3.30 Rs/kWh
Power Factor Charges

Any motive power connection above 3 HP running without proper capacitors installed so as to maintain Power Factor 0.90 as per the Commission's Regulation 11/2010 shall be charged extra 2.5 % of units consumed as additional power factor charges. Payment of the power factor charge won't exempt the consumer from his responsibility to maintain the power factor. In case of abnormal power factor decrease, the department will give the consumer 15 days' time to install appropriate capacitors and maintain the standard power factor. If the consumer is not able to rectify the problem within the notice time, the connection will be liable for disconnection. The ED DD reserves the right to install a suitable capacitor at its own cost and recover the cost thereof as arrears of energy charges. In case the monthly average power factor is less than 0.70 lagging, the installation is liable for disconnection after due notice.

5. HT/EHT
i High Tension Consumer (For all units) 240 Rs/kVA/month 3.55 Rs/kWh
ii HT Industrial (Ferro Metallurgical/ Steel Melting/ Steel Rerolling/Power Intensive (For all units) 425 Rs/kVA/month 3.50 Rs/kWh
1. Penalty Charges: Twice the applicable charges.
a) Penalty charges will be levied on those units which are drawn beyond the contract demand. These units will be worked out on pro-rata basis co-relating the total consumption of the month with billing demand.
b) If Industries are overdrawing power by more than 20% of the Contract Demand, their electricity connection will be disconnected immediately.
2. Power Factor Charges
(a) The monthly average power factor of the supply shall be maintained by the consumer not less than 0.90 (lagging). If the monthly average power factor of a consumer falls below 90% (0.9 lagging), such consumer shall pay a surcharge in addition to his normal Tariff @ 1% on billed demand and energy charges for each fall of 0.01 in power factor up to 0.7 (lagging).
(b) In case the monthly average power factor of the consumer is more than 95% (0.95 lagging), a power factor incentive @ 1.00% on demand and energy charges shall be given for each increase of 0.01 in power factor above 0.95 (lagging).
(c) If the average power factor falls below 0.70 (lagging) consecutively for 3 months, the licensee reserves the right to disconnect the consumer's service connection without prejudice for the levy of the surcharge.
(d) The power factor shall be rounded off to two decimal places. For example, 0.944 shall be treated as 0.94 and 0.946 shall be treated as 0.95
3. Billing Demand

Billing demand will be the highest among the following:

(a)100 kVA
(b) 85% of the Contract demand
(c) Actual Demand Established
6. AGRICULTURE
i For sanctioned load up to 10 HP - 0.65 Rs/kWh
ii Beyond 10 HP and up to 99 HP sanctioned load - 0.90 Rs/kWh
Power Factor Charges

Any motive power connection above 3 HP running without proper capacitors installed so as to maintain Power Factor 0.90 as per the Commission's Regulation 11/2010 shall be charged extra 2.5% of units consumed as additional power factor charges. Payment of the power factor charge won't exempt the consumer from his responsibility to maintain the power factor. In case of abnormal power factor decrease, the department will give the consumer 15 days' time to install appropriate capacitors and maintain the standard power factor. If the consumer is not able to rectify the problem within the notice time, the connection will be liable for disconnection. ED-DD reserves the right to install a suitable capacitor at its own cost and recover the cost thereof as arrears of energy charges. In case the monthly average power factor is less than 0.70 lagging, the installation is liable for disconnection after due notice.

7. PUBLIC LIGHTING
i For all units - 3.75 Rs/kWh
8. HOARDINGS/SIGNBOARDS
i Hoarding/Signboards Rs 100 per kVA per Month or part thereof 6.20 Rs/kWh
9. Temporary Supply

Tariff for Temporary Connection shall be Fixed/ Demand charges (if any) plus energy charges (for relevant slab, if any) under corresponding permanent supply category plus 50% of both. For multi activity pursuit, applicable Tariff for temporary connection shall be with reference to that of non-domestic category for permanent supply.

The Temporary Tariff are applicable for temporary period of supply up to 1 (one) month, which can be extended for another period of supply up to a maximum period of 2 years.

8.2. Applicability
Category Applicability Point of Supply/Notes
1. Domestic This schedule shall apply to private houses, hostels, hospitals run on Non-commercial lines, Charitable, Educational and Religious Institutions for Light, Fans, Radios, Domestic Heating and other household appliances including water pumps up to 2 HP.
2. Commercial This schedule shall apply to Shops, Offices, Restaurants, Bus Stations, Photo Studios, Laundries, Cinema Theatres, Industrial Lighting, clubs and other Commercial installations. This includes all categories which are not covered by other tariff categories including Domestic Category, Low Income Group, Industrial LT, HT/EHT Category (A&B), Agriculture and Poultry, Public Lighting.
3. LT Industrial This schedule shall apply to all Low Tension Industrial Motive Power Connections including water works/pumps with sanctioned load up to 99 HP.
4. LT Public Water Works
5. HT consumers This schedule shall apply to all Industrial/Motive power consumers drawing through 11 kV and 66 kV systems having contract demand of 100 kVA and above.
6. HHT Industrial (Ferro Metallugical / Steel Melting / Steel Rerolling/ Power Intensive (For all units)
7. Agriculture This schedule shall apply to Agriculture or poultry loads up to 99 HP sanctioned load will be considered in this category.
8. Public Lighting
9. Hoardings/ Signboards This schedule shall apply to electricity for lighting external advertisements, external hoardings and displays at departments stores, malls, multiplexes, theatres, clubs, hotels, bus shelters, Railway Stations shall be separately metered and charged at the tariff applicable for "Advertisements and Hoardings" category, except such displays which are for the purpose of indicating / displaying the name and other details of the shop, commercial premises itself. Such use of electricity shall be covered under the prevailing tariff for such shops or commercial premises. The connection for "Advertisements and Hoardings" category would be covered under the permanent supply of connection.
10. Temporary Supply The Temporary Tariff is applicable for a temporary period of supply up to 1 (one) month, which can be extended for another period of supply up to a maximum period of 2 years.
8.4. Schedule of Miscellaneous Charges
Description Approved Charges
Monthly Meter Rental Charges(as per provisions of Regulation 7.3 (1) of JERC (Electricity Supply Code) Regulations 2010)
Single Phase LT meter Rs10 per month or part thereof
Three Phase LT meter Rs25 per month or part thereof
LT Meter with MD indicator Rs200 per month or part thereof
Tri-vector Meter Rs500 per month or part thereof
Note :

The type of meters to be installed in consumer premises will be decided by the department. Generally the consumers having connected load above 50 HP will be provided with L.T.M.D meters

Reconnection Charges(as per provisions of Regulation 9.3 (c) of JERC (Electricity Supply Code) Regulations 2010.
LT Services
Single Phase LT Rs 50/-
Three Phase LT Rs 100/-
HT Services Rs 1000/-
Note :

If the same consumer seeks reconnection within 12 months from the date of reconnection or disconnection, 50% will be added to above charges.

Testing Fee for Various Metering Equipment’s(as per provisions of Regulation 7.4 of JERC (Electricity Supply Code) Regulations 2010.
Single Phase Rs 100/-
Three Phase Rs 300/-
Three Phase Tri-vector Meter (0.5 Class) Industrial LT Consumer Rs 500/-
Three Phase Tri-vector Meter (0.5 Class) 11 kV HT Consumer Rs 1000/-
Combined CT/PT Unit for 11 KV Consumer Rs 500/-
66 KV CT/ PT Unit Rs 500/-
Three Phase CT Block Rs 300/-
CT Coil Rs 100/-
Service Connection Charges (as per provisions of Regulation 3.3 (3) of JERC (Electricity Supply Code) Regulations 2010.
Single Phase LT Rs250/-
Three Phase LT Rs1,000/-
HT (First 500 KVA) Rs10,000/-
HT (Beyond 500 KVA) Rs1,000/- per 100 KVA or part thereof
Extra Length - Single Phase Rs25/- per meter
Extra Length - Three Phase Rs50/- per meter
Extra length chargeable will be beyond the permissible 30 meters free length from existing network for new connections for all categories except agriculture. Free length in respect of new agriculture consumer is 300 meters.
Entire Cost of setting up HT connection would be borne by the consumer and the agreement period would be two years for the category. 15% supervision charges shall be recovered by the ED DD.
Fees (Non-refundable) for submission of Test Report of wiring Completion
Single Phase Lighting / Domestic Rs 10/- Per Test Report
Three Phase Lighting / Domestic Rs 25/- Per Test Report
Single Phase Lighting / Non Domestic Rs 50/- Per Test Report
Three Phase Lighting / Non Domestic Rs 100/- Per Test Report
Three Phase LT Industries Rs 250/- Per Test Report
Single Phase / Three phase Agriculture / Streetlight / Public Lighting & others Rs 50/- Per Test Report
HT Industries upto 500 KVA Rs 1,000/- Per Test Report
HT Industries upto 2500 KVA Rs 5,000/- Per Test Report
HT Industries above 2500 KVA Rs 10,000/- Per Test Report
Download Tariff Order